By the way, this bridge is the first of its kind in Macedonia, and its design and construction are a rarity and a challenge for every engineer who wants to learn something more about the new technologies of building structures. The construction solution of the bridge is distinguished by the fact that three types of construction systems are applied with three methods of execution: reinforced concrete construction consisting of columns, beams and slabs with a monolithic construction, coupled steel-concrete bridge construction with a semi-assembled construction, this includes the construction of reinforced concrete slab on site and the performance of the bridge beam steel structure with prefabricated installation, as well as the third type of structural system – suspended construction, consisting of main bearing cables and hangers with prefabricated installation. In 2017, at the request of the investor JSP Skopje, an amendment was made to the design documentation, where our engineers made the necessary corrections in order to fit the structure into the new architectural concept.